Want to develop your digital product? Want to know more about the pricing model and what to go for to manage your budget the best?
Commonly, software development companies propose two of the most common agreements for the pricing model: Time and material or Fixed Model.
If these terms seem foreign to you, do not worry; we are here to help you with this. In this blog, we have covered some important pointers of both:
So let's get started!
So, the name Time and Material itself is simple to understand. The model depends on the time taken by the company to complete a project and all the materials used in the development. The total cost depends on the quality and time of work the client wants. This model does not have a particular total cost at the beginning of the work.
Moreover, most importantly both parties agree on the hourly rates and the material that will be used. So even when the project takes some extra time, both parties have confirmation of getting the work done and reimbursement.
Everything is included in the contract, including all the meetings, project management, and other required actions.
There are many advantages of time and material agreement; let's have a look at some of them:
Everything has its pros and cons, and so do time and material models. Although it might look like the best option for you, you should be aware of the drawbacks as well to gain full knowledge.
In this type of project model, the client is already aware of the time and amount required for the entire project before it starts. Sometimes, it can go a little higher than the initial set price but not extremely much due to some other implementation and requirement demanded by the client, and they are well aware of the situation from the start.
So, how does the strategy work? Let’s take a real-life example to understand it better: it’s your birthday, and you want to look perfect wearing a princess gown, so you go to your favorite boutique and get your measurements done and decide all the fabric, color design everything at the last the owner will provide you with the total cost and a time.
But what if you change your mind and don’t want that dress anymore after some days? So, in this case, the person working on your dress cannot help you with it; they can suggest modifications, but they cannot change the whole base of the dress. Similarly, the projects are provided with all the details and time frames. You can just do the modification once it gets started but cannot change the whole project, so be careful about the decision in the very beginning.
The fixed price agreement has multiple benefits for the clients. Let's have a look at some of them.
Here are some drawbacks of the Fixed price model that you need to have a look at before coming to a decision.
To see the core difference let’s have a look at the table made below.
Aspect | Time & Material Model | Fixed Model |
Cost Structure | Based on actual time spent and materials used | Fixed cost agreed upon at the beginning of the project |
Flexibility | High flexibility; scope can evolve throughout the project | Limited flexibility once scope and cost are agreed upon |
Risk Management | Shared risk between client and development team | More risk on the development team |
Scope Changes | Easier to accommodate changes in project scope | Scope changes may incur additional costs or delays |
Project Control | Client has more control over project direction and budget | Developer has more control over project schedule and budget |
Transparency | High transparency as costs are tracked in real-time | Limited transparency until project completion |
Predictability | Less predictable in terms of final cost and timeline | More predictable final cost and timeline |
Client Involvement | Requires more active involvement from the client | Client involvement may vary depending on agreement |
Adaptability to Changes | More adaptable to changes in project requirements | Less adaptable to changes without incurring additional costs or delays |
We have mentioned some important points in this section so that businesses looking for development can make better choices.
1. If you are planning for long-term and complicated project development.
2. When you are not clear about the requirement it can change accordingly as development carry-outs.
3. You need your project to be perfect, and work should be done with flexibility.
4. You didn't have any budget issues and were ready to invest.
5. You need full control over the project by being in the loop.
Here are some points to know when you can choose the fixed model for your project.
1. When you want to develop an MVP for your project or if it is a medium- to small-sized project, you can go for a fixed-price contract.
2. When you have a budget and want to work within it.
3. The project requirements are clear and won't change.
4. If you want to work on the existing project for some modifications or extra implementation.
5. You very urgently want to work on the project and want to deliver it as soon as possible.
Till this section, I hope you have a good amount of knowledge about both models but are still confused about which one is the best model to choose from for your Digital Product Development. There is no doubt both models are best in their ways and can be helpful for diverse project requirements. As we discuss, everything has pros and cons. So we cannot decide which one is the best choice for your project.
But according to the above points you can easily differentiate between both and decide as per the requirement. If you are looking for a long-term project and don't have any time constraints nor a budget is fixed you can, without thinking much go for the Time and Material model.
On the other hand, if you want to rework on the existing project or want to just make an MVP for your digital project, you can go for the fixed model. Secondly, if you have a fixed budget, this is the best choice. Go for it.
At the end, the decision is yours, and for more details, you can contact the experts who can explain everything according to the project requirement you have.
Still confused over both terms don’t worry we are here to help you with deciding the best for your digital product development. At PixelBrainy, we focus on helping clients reach the best height. We have a team of expert developers who are well-versed with the latest technology and trends to implement things at their best.
As a leading software development company, we strongly believe in the power of innovation and clients' requirements. Working with us on any type of agreement, you still have control over the budget, and our team will work dedicatedly on your project as per your needs. We have delivered some of the million-dollar projects related to mobile app development and website development with many happy clients.
Connect with us today and get the best choice for your digital product development.
Coming to a conclusion, choosing between the Time and Material (T&M) or Fixed Model for your digital product development depends on various factors and demand of your project. Both have their pros and cons and can do best in their field.
It is you, the end, who decides which one to choose as per what you are looking for in your agreement.
Choose wisely, or get the help of experts today to start your digital product development journey.
The main difference between the Time and Material (T&M) and Fixed Price models lies in their approach to project pricing and management. In the T&M model, costs are based on actual time spent and materials used, providing flexibility for evolving project requirements. In contrast, the Fixed Price model involves agreeing upon a set price for the entire project scope upfront, offering predictability but limited flexibility for changes.
When deciding between Time and Material and Fixed Price models, factors to consider include project complexity, clarity of requirements, budget constraints, client involvement, risk tolerance, and the level of flexibility needed in accommodating scope changes.
The Time and Material model handles changes in project scope by offering flexibility to adapt to evolving requirements. Clients can request changes throughout the project, and costs are adjusted accordingly based on additional time and materials needed. This allows for greater agility in responding to changing needs and priorities.
About The Author
Sagar Bhatnagar
Sagar Sahay Bhatnagar brings over a decade of IT industry experience to his role as Marketing Head at PixelBrainy. He's known for his knack in devising creative marketing strategies that boost brand visibility and market influence. Sagar's strategic thinking, coupled with his innovative vision and focus on results, sets him apart. His track record of successful campaigns proves his ability to utilize digital platforms effectively for impactful marketing efforts. With a genuine passion for both technology and marketing, Sagar continuously pushes PixelBrainy's marketing initiatives to greater success.
Transform your ideas into reality with us.